
Add to Cart
186-1525 1861525 Wheel Loader 24v Hydraulic Solenoid Valve
Product Description
Appliion |
|
OEM NO. | CA1861525 186-1525 1861525 |
MOQ: | 1PCS |
Warranty | Within 12 Months |
Type | Solenoid Valve |
Voltage | 24DC |
Place of Origin | Guangzhou, China(Mainland) |
Applicable industry | Machinery Repair Shops, Construction Works |
Status | 100%NEW |
Service system | Field Installation, Commissioning And Training, Field Maintenance And Repair Service, Online Support, Engineers Available To Service Machinery Overseas, Free Spare Parts |
Product advantages
1. The solenoid valve core is made of advanced CNC numerical control machinery, the installation hole position is accurate, and the size has no deviation.
2. Customized spring, great elasticity, the coil magnetic force increases.
3. Using imported copper coil, high temperature resistance of 200 degrees, to solve the problem of insufficient strength of the coil after high temperature.
4. The oil seal imported from Japan is used, which is not easy to deform, does not leak oil, and has better sealing performance.
5. High-quality plugs and pins are used to effectively avoid loose plugs and solve problems such as poor contact.
6. The high-quality appearance is designed and processed by baking paint spraying, which can effectively prevent the product from aging in a short time.
Product test
186-1525 Product Part Number Mounting Loion
More related products you are looking for
FAQ
Q1. You are a trader or a manufacture?
A1.We are an industry and trade integration business, our factory loed on Guangzhou, Guangdong, China
Q2. How can I be sure the part will fit my excavator?
A2.Give us correct model number/machine serial number/ any numbers on the parts itself. or measure the parts give us dimension or drawing.
Q3. How about the payment terms?
A3.We usually accept T/T or Trade Assurance. other terms also could be negotiated.
Q4. What is your minimum order?
A4.It depends on what you are buying. Normally, Our minimum MOQ is 1PCS
Q5. What is your delivery time?
A5. Generally, it will take 1 to 3 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q6. What about Quality Control?
A6.We have a perfect QC system for the perfect products. A team who will detect the product quality and specifii
on piece carefully, monitoring every production process until packing is complete, to ensure product safety into container.